Page 1 of 1

job runtime ajust

Posted: Tue Jan 12, 2016 11:34 am
by jacala
Hello!

We are using Sheetcam more and more. We get requests how long a job is gonna take.

The estimate in the job report is always 30% (it varies) off. Of course that is because it is not setup for our machine speeds etc.

How can I adjust these settings so the report will be as accurate as possible.

I've searched this forum but probably are not using the right search terms.

Posted: Tue Jan 12, 2016 6:14 pm
by Les Newell
You can set the rapid speed of the machine and the pierce time. The cutting time assumes the machine does not have to slow down for corners. I am a little surprised it makes that much difference though.

Posted: Tue Jan 12, 2016 8:25 pm
by Vmax549
The main problem lies with most plasma machines as they cannot maintain a constant feedrate due to slow accelleration. With a very artsy detailed cut the machine spends a great deal of time at 30-50% of specified feedrates due to CV and settings. Therefor a larger margin of error on completion times.

(;-) TP

Posted: Tue Jan 12, 2016 10:13 pm
by SeanP
I have noticed the slowdowns in cut rules don't seem to be accounted for in the job report, but someone the other day pointed out to me in simulation mode the seconds timer that gives accurate run time, speeded up to 5000% or so it works great.

Posted: Wed Jan 13, 2016 6:07 am
by Les Newell
I never noticed that rules aren't taken into account. I'll look into fixing that.

Posted: Wed Jan 13, 2016 1:00 pm
by SeanP
Nice one if you can Les! I wasn't expecting that :lol:

Posted: Mon Apr 11, 2016 3:21 pm
by Les Newell
This is now fixed for the next development release.

Posted: Sat Apr 16, 2016 7:17 am
by SeanP
Nice one I will try that,, cheers