I have imported multiple parts into one sheet but when I try to run my PP it will only run for the first part. How do I get it to create G-code for all the parts?
- make sure the Parts are checked in the box left of the name, only the Parts checked will post process.
- make sure each Part when selected (highlighted) has Operation(s) in the Operation window bottom left, and make sure the Operations are checked in the box left of the name.