Report created: @Date@ @Time@

Job report

Job:            @JobName@
Customer:

Machine

Machine:        @Type@ Machine Kerf width:        @Kerf_width@
Material: @Material_Type@ Thickness: @Material_Thickness@
NC File Name: @Comment@
 Machine: @Type@ Machine  Kerf width: @Kerf_width@
 Material: @Material_Type@  Thickness: @Material_Thickness@
 NC File Name: @Comment@
 Machine: @Type@ Machine  Material: @Material_Type@
 Feed Rate: @Feed_rate@  Thickness: @Material_Thickness@
 NC File Name: @Comment@
Machine: @Type@ Machine Material: @Material_Type@
Cut Gas:             @Cut_Gas@ Thickness:               @Material_Thickness@
Pierce Type:      @Pierce_Type@ Nozzle:                @Nozzle@
NC File Name: @Comment@

 Job

 Job Size:                    @JobExtentW@L X @JobExtentH@W  Job area:   @JobArea@2
 Total cut distance:    @CutDistance@  Total Rapid distance:   @RapidDistance@
 Est. cutting time:      @CutTime@  Est. Total Job time:         @TotalTime@
 Number of starts:     @Pierces@

 Parts

Part: @Name@
Number of parts cut: @PartsCut@

 

Page @PageNumber@ of @PageCount@